Located on the border of Pierrefonds and Kirkland, this 22,496 sq. ft. lot offers the opportunity to develop a brand-new 4-storey multi-unit building. Zoning requires a commercial ground floor with three floors of residential units above. A prime site to bring your development vision to life--don't miss the chance to secure this dream lot for your next project.
$627,100
$310,300
"This study was prepared by an independent third party with
decades of experience in the Québec City government. It is
provided for guidance purposes only and must be verified by
the Buyer."
This zoning district, under By-law CA29 0040, authorizes
mixed-use constructions with a maximum height of 4 storeys.
The ground floor must be occupied by commercial uses C1 and
C2.
The upper floors must be occupied by residential groups H3
and H4. Group H3 corresponds to buildings of 4 or more
dwellings.
The 4th floor must be set back 2 m from the façade wall.
It is possible to construct a building measuring 28.85 m
(95.65 ft) in width by 34.29 m (112.5 ft) in depth (see
attached plan).
For residential use, there is no minimum number of parking
spaces required. The maximum is 1 parking space per
dwelling unit. All parking spaces must be located
underground.
For commercial use, there is no minimum number of parking
spaces required. The maximum is 1 parking space per 35
square metres of floor area.
Considering the development of 2-bedroom units with an
average area of 80 m² (860 sq. ft.), it would be possible
to provide 10 units per floor, for a total of 30 units (see
attached plan).
It would be possible to provide an outdoor parking area of
up to 11 spaces. A parking lot of 12 spaces or more would
require a reduction of the building size due to different
planning standards.
BUILDING | |
---|---|
Type | Lot |
Style | |
Dimensions | 0x0 |
Lot Size | 2090.32 MC |
EXPENSES | |
---|---|
Municipal Taxes (2025) | $ 23932 / year |
School taxes (2025) | $ 769 / year |
CHARACTERISTICS |
|
---|---|
Zoning | Commercial, Residential |
Distinctive features | Environmental study phase 1, Environmental study phase 2 |
Sewage system | Municipal sewer |
Water supply | Municipality |
Loading maps...
Loading street view...